Before you
price BIM.
Know the work. Understand the cost. Make sure your trade benefits.
Built around the trade questions that matter: modelling, coordination, fabrication, technology, rates and reading the contract properly. Use this with your estimator, detailer and project lead before submitting a price.
Choose a status for each item. Use Clarify for anything you cannot confidently price. Use Not required only when it is outside the agreed scope.
No login or submission. Your selections and notes stay in this page session and are not sent to BIMTA. Print or save as PDF before leaving or refreshing. Keep confidential project details out of this worksheet.
Read the scope before the rate.
A BIM requirement is work to price, not a blank cheque for more work.
Define what you are modelling.
Price the actual output. A detail label alone does not describe the effort.
Price coordination and change.
The meeting is only part of the work. Preparation, revisions and repeat checks take time too.
Separate coordination from fabrication release.
An accepted coordination model does not automatically authorise the shop to build.
Check the technology and the people.
A software licence is only one part of delivering the work reliably.
Price the full effort. Keep the value.
Make the trade's benefit visible, and make the cost of providing it visible too.
What needs an answer before you price?
Track what BIM actually costs.
Use one Excel workbook per project. Set task budgets, record labour and allocated technology costs, and review forecast overruns. Includes 24 BIM-only cost codes, 150 task rows, 500 cost entries and concise instructions.
Download BIM project cost scorecard (.xlsx) ↓Original BIMTA template. Costs remain in your saved file and are not uploaded to BIMTA. Internal tracking codes are not an industry classification standard.